Installation of CRA multiphase pipe-in-pipe (PIP) and gaslift pipelines necessary to increase capacity utilising existing infrastructure in the North Sea’s Greater Ekofisk Area.

Company: ConocoPhillips Skandinavia AS 

Location: Greater Ekofisk Area, southern Norwegian North Sea 

80 m

Max. water depth 

Scope of work 

  • Installation of 16/22-inch multiphase PIP pipelines (6.8-km and 0.7-km respectively) 
  • Installation of two 0.7-km, 6-inch Gaslift pipelines 
  • Design, fabrication & installation of multiple 16-inchCRA/Duplex PLEM/PLET/bulk-head structures 
  • Fabrication of CS 6-inch PLEM/PLET structures  
  • Fabrication & installation of mattress to safeguard cable crossing locations, & GRP covers to protect the subsea structures  
  • Support activities (incl. pre-lay and post-lay surveys, crossing preparations) 
  • Trenching of multiphase flowline and water injection pipeline 
  • Pre-commissioning of all four pipelines 

16/22-inch 

multiphase PIP pipelines

Image
2023 Eldfisk North

Specials & challenges 

  • Design, fabricate & install PIP system in Pioneering Spirit’s firing line 
  • First-time use of Allseas in-house developed FJC PP sheet wrapping machine 
  • First-time installation of large PLEM/ILT structures with Pioneering Spirit 
  • Installation of CRA pipeline with first-time use of 
  • surface tension transfer technology (STT) for root pass welding 
  • Pipeline start-up with PLEM configuration next to drill rig 
  • Installation of 6-inch pipeline with Pioneering Spirit in low tension mode 
  • Design & fabrication of CRA/Duplex PLEM/ILT structure 

6-inch 

pipeline with Pioneering Spirit in low tension mode 