Transport and single-lift installation of a second process platform topsides (P2) at the central platform complex for Phase 2 development of the giant Johan Sverdrup field in the Norwegian North Sea. 

Company : Equinor 

Location : Norwegian North Sea, 160 kilometres west of Stavanger 

110 m 

Max water depth

Scope of work 

  • Installation engineering (incl. input to topsides design team) 
  • Barge tow of topsides from the fabrication yard in Haugesund to transfer location near Stord, Norway 
  • Transport & single-lift installation of the complete 25,500-t P2 topsides & connecting bridge 

25,500-t 

P2 topsides

Image
2022 Johan Sverdrup (Phase 2)

Specials & challenges 

  • 3 years of engineering & preparation, 48 hours of execution 
  • First-time use of yokes for topsides installation  
  • First topsides installation without Leg Mating Units (LMUs) 