Installation of twin CRA flowlines connecting the Julimar and Brunello natural gas fields with the Wheatstone platform, off the coast of Western Australia.
Company: Woodside Energy
Location: Northwest Shelf, Western Australia
150 m
Max. water depth
Scope of work
- Installation of twin 22.5 km, 18-inch CRA flowlines
- Installation of 22.5 km, 4-inch MEG line
- Installation of various subsea structures (PLETs, adjustable pipe supports & displacement initiators)
- Flooding, gauging & testing of pipelines
22.5 km
(4-inch) MEG line
Image

Specials & challenges
- Fast-track project with fabrication scope
- Tight installation tolerances of lay-in PLETs.
- Last-minute change to part of scope, switching from Audacia to Lorelay