Image

Fast-track installation of 90-km deepwater gas export pipeline connecting deepwater production facility with mainland Israel.
Company : TechnipFMC (Energean)
Location : East Mediterranean, 90 km offshore Israel
1750 m
Max water depth
~7500
pipe joints from Cyprus
1700 m
water depth for 30/24-inch pipeline