Construction of 167-kilometre long, 20-inch export pipeline connecting the Garden Banks (GB) 72 platform to the ultra-high-pressure Shenandoah deepwater development in the Gulf of Mexico. 

Company : Genesis Energy

Location : U.S. Gulf of Mexico, 257 km off the Louisiana coast 

2012 m

Max. water depth 

Scope of work 

  • Design & fabrication of installation aids, in-line structures (PLETs, ILY, ILV, flange c/w dual ball 
  • valve valve) 
  • Design & production of 18-inch and 20-inch VIV strakes (incl. anti-fouling coating) 
  • Installation of 167 km, 20-inch oil pipeline 
  • Installation of 4.4 km, 18-inch SCR c/w titanium stress joint 
  • Installation of buckle arrestors, anode joints and mattresses at 18-inch start-up location  

167 km, 20-inch 

Installation of oil pipeline 

Image
2023 Shenandoah Export Pipeline

Specials & challenges 

  • Short preparation and fabrication time 
  • Fatigue testing of SCR welds as part of SCR weld procedure qualification programme 
  • Pipeline initiation in a congested area 
  • Pipeline installation across a subsea escarpment area 