Image

Installation of dual 148-kilometre export pipeline bundles (16-inch piggybacked with 4-inch MEG) and five 10-inch utility lines connecting the deepwater Tamar gas field to the Tamar platform.
Company: Noble Energy
Location: Eastern Mediterranean, 90 km west of Haifa, Israel
1700 m
Max. water depth
~300-km
16-inch export pipelines piggybacked
1700 m
installation of piggybacked export bundles