Pioneering Spirit’s pipelay debut advances the technical boundaries of the industry, laying a dual 32-inch diameter pipeline system at depths exceeding 2200 metres through the Black Sea from Russia to Turkey.

Company: South Stream Transport B.V. 

2200 m

Max water depth

Scope of work 

  • Mobilise vessels through the Bosporus 
  • Pre-lay route survey & seabed preparations (cable-crossing supports, dredging) 
  • Pipe haul from marshalling yards 
  • Pull-ins (2x through micro-tunnels at Anapa, Russia, 2x through open-cut trench at Kıyıköy, Turkey) 
  • Design, engineering & installation of dual 940-km, 32-inch pipeline system 
  • Post-lay span rectification works 
  • 4x above water tie-ins 
  • As-laid survey 
  • Flood, gauge, test, dewater & dry pull-in sections 

Specials & challenges 

  • One of the most challenging pipeline projects ever attempted both in terms of design and manufacturing & construction 
  • Safe and efficient installation of the world’s first 32-inch pipeline system installed at water depths exceeding 2200 m 
  • Longest pipeline in Allseas’ history (up to 2018) 
  • Black Sea’s challenging subsea environment with high H2S values & seabed conditions with geohazard risks 
  • First-time above surface pipeline tie-ins executed by DP pipelay vessel (Lorelay)  
  • More than 138,000 welds on a total of 73,618 double joints installed 