Engineering, preparation and removal of multiple platform facilities (weighing over 35,000 tonnes) from Denmark’s largest gas field, Tyra, and delivery to recycling yards in Denmark and the Netherlands. 

Company : Total Denmark 

Location : Danish North Sea, 225 km west of Esbjerg 

Removal : 2020 (Phase 3), 2022 (Phase 4) 

42 m 

Water depth

Scope of work 

Phase 3 (2020)  

  • Engineering, preparation, removal & disposal (ERPD) of 14,000-tonne TEA processing/accommodation topsides & 7600-tonne TWA processing/accommodation topsides, plus additional modules, support frame, flare jackets & monopile 
  • Transfer of topsides & modules to Iron Lady for load-in to M.A.R.S. yard at Frederikshavn, Denmark 
  • Transfer of flare jackets to Iron Lady for load-in to Sagro yard at Vlissingen, the Netherlands 
  • Pre-lift preparations (incl. removal & separation of under-deck caissons) & leg cutting 
  • Design, fabrication & installation of bearing blocks to accommodate horseshoe lifting tools 

Phase 4 (2022)  

  • Engineering, preparation, removal & disposal (ERPD) of 5400-tonne TEA jacket & 3100-tonne TWA jacket, plus remaining monopile section 
  • Transfer of jackets to Iron Lady for load-in to M.A.R.S. yard at Frederikshavn, Denmark 
  • Pre-lift preparations  

14,000-tonne 

TEA processing/accommodation topsides

7600-tonne 

TWA processing/accommodation topsides

Image
2022 Tyra Redevelopment (Phase 3 & 4)

Specials & challenges 

  • Design & fabrication of bearing block type lift points, (horseshoe) lifting yokes, leg support structures, spreader bars & frames 
  • Lift of modules with internal lifting tools (ILTs) 
  • Subsea dredging & cutting with internal & external cutting tools 
  • Load-in operations by means of hydraulic skidding for topsides & SPMTs for other structures 
  • Very limited air gap due to subsidence of both fields (5-7 m) 
  • Very narrow span between topsides legs & outreach of TLS beams 
  • Close proximity to the other platforms in the field