Construction of 18-inch oil and gas export pipeline connecting the ultra-deepwater Whale field with existing platform and pipeline infrastructure in the southern Gulf of Mexico. 

Company : Williams Field Services Group 

Location : U.S. Gulf of Mexico, 320 km southwest of Houston 

2700 m

Max. water depth 

Scope of work 

  • Design, fabrication & installation J-mode (2x PLETs, 1x PLEM) and S-mode (1x ILS and 1x dual ball valve assembly) structures 
  • Installation of ~250-km of 18-inch export pipeline 

~250-km 

of 18-inch export pipeline 

Image
2022 Whale Oil & Gas Export Pipelines

Specials & challenges 

  • Water depths ranging from 100 m to 2700 m 
  • Handling & transportation of ~20,500 pipe joints 
  • Peak lay rate of 7.65 km/day (fastest lay rate by Solitaire in past 10 years); average production lay rate of 6 km/day 
  • In-house developed NDT system Dolphin trialled offshore for the first time 
  • Installation of in-house designed and produced VIV strakes (3 km on the pipes) 
  • New Allseas PLET installation depth record (2615 m) 
  • One of the deepest pipelines ever installed (18-inch pipe / 2650 m water depth) 

2615 m

Allseas PLET installation depth record