Pioneering Spirit’s maiden heavy lift project for the offshore industry, comprising single-lift removal, transportation and load-in to shore of the complete 13,500 t Yme mobile offshore production unit. 

Company : Repsol (previously Talisman) / SBM offshore 

Project : Yme MOPU (mobile offshore production unit) Removal 

Location : Norwegian North Sea, 120 km southwest of Stavanger 

93 m

Water depth 

Scope of work 

  • Engineering & removal of 13,500-tonne mobile offshore production unit (MOPU) 
  • Transfer of MOPU from Pioneering Spirit to Iron Lady for load-in to dismantling yard Lutelandet, Norway 
  • Pre-lift preparation work (incl. installation of temporary strain fenders around caisson & leg cutting) 
  • Design & fabrication of leg cutting equipment  

13,500-tonne 

mobile offshore production unit (MOPU) 

Image
2016 Yme MOPU Removal

Specials & challenges 

  • First commercial offshore lift with Pioneering Spirit  
  • One of the heaviest offshore lifts in history 
  • Design of temporary constraint between caisson and MOPU for release to allow platform access 
  • Design of fender system to protect caisson during vessel move out  
  • Design & fabrication of 5 lift support tools (yokes) specific to the MOPU 
  • Design & fabrication of internal leg cutting tools  
  • Suitable lift point configuration to maintain structural integrity of MOPU during lift (not possible to reinforce MOPU hull)

 5 lift 

support tools (yokes) specific to the MOPU 

Image
2016 Yme MOPU Removal
Image
2016 Yme MOPU Removal
Image
2016 Yme MOPU Removal