Our worldwide project highlights

With over 300 projects and more than 28,000 kilometres of subsea pipeline installed worldwide, we continually set new standards for excellence. Our state-of-the-art vessels excel in deepwater installation, pipelay and single lift installation, removal and transport. We design, build and execute for project scopes involving complex pipelay and heavy lift.

Image
Audacia first PLET for Barossa GEP

Atapu-2

Engineering, procurement, construction and installation (EPCI) of a riser-based subsea system for the ultra-deepwater Ataptu-2 pre-salt field development offshore Rio de Janeiro. 

Image
DolWin kappa

BalWin1 & BalWin2

Transport & installation of two 2GW converter stations for the BalWin1 and BalWin2 offshore grid connection systems in the German North Sea.

Image
Trunkline installation by Solitaire

YongAn and TungHsiao (YT2)

Installation of a 232-kilometre, 36-inch natural gas pipeline connecting YongAn and TungHsiao, strengthening Taiwan’s gas transmission capacity, resilience and long-term energy security.

Image
BorWin epsilon topsides and jacket transport to installation site

BorWin4 & DolWin4

Transport & installation of two 900 MW converter stations for the BorWin4 and DolWin4 offshore grid connection projects in the German North Sea.

Image
Norfolk Boreas

Norfolk Boreas

Transport and installation services for the UK’s Norfolk Offshore Wind Zone, one of the largest offshore wind developments in the world.

Image
Pipelay on TurkStream.

Troll Phase 3 - Stage 2

Installation of gas export pipeline, including inline tees and associated subsea structures, supporting continued gas production from the Troll West field to the Troll A platform

Image
T&I contract for PS

Gennaker West & East

Transport and installation (T&I) of two major substations for the Gennaker offshore wind farm in the German Baltic Sea, developed by transmission operator 50Hertz.

Image
Fortitude and Audacia

Búzios-10

Landmark pipelay project covering engineering, procurement, construction and installation of a rigid riser-based subsea system for development of Brazil’s largest oil field, Búzios-10.

Image
36-inch connector passing SOL stinger

Troll Phase 3 - Stage 1

Installation of a 36-inch concrete-coated export line, with tie-in points, connecting the iconic Troll A platform with gas reserves in the Troll West field

Image
Hugin-A schematic

Hugin A topsides installation

Transport and single-lift installation of 31,000-tonne platform to serve as the production hub for the Yggdrasil development in the Norwegian sector of the North Sea.

Image
Audacia J-mode PLET

Malampaya Phase 4

Installation of key pipelines and umbilicals for latest development of Malampaya deepwater gas field in the Philippines