Our worldwide project highlights

With over 340 projects and approximately 30,000 kilometres of subsea pipeline installed worldwide, we continually set new standards for excellence. Our state-of-the-art vessels excel in deepwater installation, pipelay and single lift installation, removal and transport. We design, build and execute for project scopes involving complex pipelay and heavy lift.

Image
Audacia first PLET for Barossa GEP

Atapu-2

Engineering, procurement, construction and installation (EPCI) of a riser-based subsea system for the ultra-deepwater Ataptu-2 pre-salt field development offshore Rio de Janeiro. 

Image
Trunkline installation by Solitaire

YongAn and TungHsiao (YT2)

Installation of a 232-kilometre, 36-inch natural gas pipeline connecting YongAn and TungHsiao, strengthening Taiwan’s gas transmission capacity, resilience and long-term energy security.

Image
Gippsland platforms

Gippsland EPR

Major decommissioning job involving removal and transport to shore of 10 platforms within Australia's Gippsland Basin with combined weight of more than 48,000 tonnes.

Image
Fortitude and Audacia

Búzios-10

Landmark pipelay project covering engineering, procurement, construction and installation of a rigid riser-based subsea system for development of Brazil’s largest oil field, Búzios-10.

Image
Mudmat installation by Fortitude on MP4

Malampaya Phase 4

Installation of new flowline system for the latest expansion of the Malampaya deepwater gas field in the Philippines

Image
Solitaire at work

Trion

Installation of 120-kilometre gas gathering line for the Trion field development – Mexico’s first ultra-deepwater oil production project – tying into the Sur de Texas pipeline laid by Allseas in 2018

Image
Solitaire in the GOM

Sparta Export Pipelines

Installation of gas and oil export pipeline system, including 2.5-kilometre steel catenary risers (SCRs), to serve the Sparta deepwater development in the Gulf of Mexico

Image
PS on Troll Phase 3 Stage 2

Troll Phase 3 - Stage 2

Installation of gas export pipeline, including inline tees and associated subsea structures, supporting continued gas production from the Troll West field to the Troll A platform

Image
Heather Alpha platform

Heather Alpha topsides removal

Engineering, preparation & single-lift removal of the 15,300-tonne Heather Alpha production and drilling topsides from the UK North Sea.

Image
Installation of 16-inch CCS pipe

Port of Rotterdam CO2 Transport Hub and Offshore Storage (Porthos)

Installation of subsea pipeline for the flagship Porthos carbon capture and storage project in the Port of Rotterdam, the first development of its kind in the Netherlands.

Image
Pioneering Spirit fast lift Eider Alpha topsides

TAQA UK’s Northern North Sea (NNS) assets

Multi-year UK North Sea decommissioning contract with TAQA UK, covering removal and disposal of 120,000+ tonnes of offshore infrastructure