Historic single-lift removal of the 31,000-tonne Brent Charlie topsides – fourth and final iconic Brent field platform removals – and delivery to the UK for recycling. 

Company : Shell UK

Location : UK North Sea, 186 km northeast of Lerwick, Shetland 

Water depth: 140 m

Heaviest offshore lift ever performed

Removal of fourth and final iconic Brent platform

Concluded two decades of engineering, planning & innovation

 

Scope of work 

  • Engineering, preparation & removal of 31,000-tonne Brent Charlie topsides 
  • Transfer of topsides from Pioneering Spirit to Iron Lady for load-in to Able UK disposal yard, Hartlepool, England 
  • Pre-lift preparation work (incl. design of underdeck lift points & strengthening of the module support frame) 
  • Cutting & seafastening of the platform legs 
  • Design & fabrication of lifting yokes, support stools & grillage 

Specials & challenges 

  • Heaviest offshore lift in history 
  • First commercial lift using horseshoe lift supports, requiring bearing block lift points installed on jacket legs
  • Design & fabrication of leg support structures & platform shear restraints (incorporated into leg cutting design for increased topsides stability after leg cutting)
  • Low strength topsides legs due to small wall thickness, requiring grout filling for necessary lift capacity 
  • Modification for reuse of Brent Delta leg support structures
  • Cutting jacket legs
  • Design, fabrication & installation of 3x GBS leg covers & navigation aid
  • Complex conductor removal & disposal scope, requiring industry-first & in-house cutting tools & techniques
  • Fabrication & outfitting of Iron Lady with multiple structures for topsides transfer and load-in (incl. spacers, support stools & leg covers)
  • Design & fabrication of ‘sliding’ layer for support stools to transfer & distribute 31,000-tonne topsides load
  • Dredging the channel between River Tees & grounding dock to ensure adequate depth clearance during load-in operation
  • Design & implementation of 8-point winch mooring system for Iron Lady to facilitate a robust tow & load-in solution
  • Last-minute modifications to grounding bed at disposal yard, requiring repositioning of skidding tracks & final set down location 
Image
2020 Brent Alpha Topsides Removal

3x 

GBS leg covers & navigation aid 

31,000-tonne 

topsides load 