Transport and installation of the 900-megawatt DolWin Kappa offshore converter station for the DolWin6 offshore grid connection system in the German North Sea.
Company : Dragados Offshore (TenneT, Siemens Energy)
Project : DolWin Kappa Offshore Converter Installation
Location : German North Sea
29 m
Max water depth
5000-tonne
jacket
11,000-tonne
transformer topsides
1 million
homes with renewable energy