Transport and installation of the 900-megawatt DolWin Kappa offshore converter station for the DolWin6 offshore grid connection system in the German North Sea. 

Company : Dragados Offshore (TenneT, Siemens Energy)  

Project : DolWin Kappa Offshore Converter Installation 

Location : German North Sea 

29 m 

Max water depth

Scope of work 

  • Transport & installation of 5000-tonne jacket, 11,000-tonne transformer topsides & bridge 
  • Lift, stab & drive the foundation piles (including noise mitigation) 
  • Grout the annulus between the piles and pile sleeves 
  • Perform jacket cut-off 
  • Perform ROV debris survey 

 5000-tonne 

jacket

11,000-tonne 

transformer topsides

Image
2022 DolWin Kappa

Specials & challenges 

  • Allseas’ first complete transformer transport & installation (T&I) for the offshore wind industry 
  • First offshore wind project for Allseas in the German Bight 
  • First-time piling of foundation jacket from Pioneering Spirit 
  • Strict environmental regulations & new legislative area of operations 
  • 12-day campaign covering departure from Rotterdam to completion of offshore works installation of jacket, piling of jacket, topsides installation 
  • DolWin6 connection will provide more than 1 million homes with renewable energy from 2023 

 1 million 

homes with renewable energy

Image
2022 DolWin Kappa
Image
2022 DolWin Kappa
Image
2022 DolWin Kappa
Display on a map
Off