Image

Transport and installation (T&I) of two major substations for the Gennaker offshore wind farm in the German Baltic Sea, developed by transmission operator 50Hertz.
Company: HSI consortium: HSM Offshore Energy, Smulders and Iv (end client German grid operator 50Hertz)
Location: German Baltic Sea
Transport & installation of 2 offshore substations with combined production capacity of +900 MW
Jacket lift system to install both topsides and jackets
First-time installation of 'suction bucket' jackets
Scope of work