Transport and installation (T&I) of two major substations for the Gennaker offshore wind farm in the German Baltic Sea, developed by transmission operator 50Hertz.

Company: HSI consortium: HSM Offshore Energy, Smulders and Iv (end client German grid operator 50Hertz) 

Location: German Baltic Sea

 

Transport & installation of 2 offshore substations with combined production capacity of +900 MW

Jacket lift system to install both topsides and jackets

First-time installation of 'suction bucket' jackets

 

Scope of work

  • Transport & installation of Gennaker 1 (DarB) & 2 (Zingst) offshore substations (jacket & topsides)
  • Engineering of installation plans and rigging
  • ROV survey work prior to and during installation
  • Assistance for levelling and grouting works
Image
Similar to the Yeu and Noirmoutier OSS installation
Display on a map
On