Installation of the critical 343-kilometre northern section of the world’s longest subsea pipeline linking Russia’s vast natural gas reserves with the European Union via the Baltic Sea. 

Company: Saipem (Nord Stream AG) 

Location: Russian Federation, Baltic Sea 

20 – 95 m

Water depth 

Scope of work 

  • Engineering, procurement & installation of twin 343-km (north & south sections), 48-inch CWC pipeline 
  • Survey support 
  • Pipe haul & logistics 

48-inch 

CWC pipeline

Image
2010 Nord Stream

Specials & challenges 

  • Longest (1224 km) and heaviest (48-inch O.D. with concrete-weight-coating) subsea pipeline ever installed 
  • Working for the first time in the Russian Federation (permits and licences) 
  • Logistics and materials supply (multiple pipe haul vessels) with client-free line pipe issued in Finland resulting in frequent border crossings 
  • Pipeline installation in curves over pre-installed span and cable crossings, over 20 m wide rock berms with a tolerance of approximately 6 m across designated centre line 
  • Development and first-time use of a A&R stretcher 
  • Installation within +/– 25 m security corridor (potential interferences during pipelay with ordnance in the vicinity) 
  • Extreme winter conditions in the northern Baltic Sea 
  • Solitaire averaged a 3 km/day production rate in the Baltic Sea while working in frozen seas 

1224 km and 48-inch

Longest and heaviest subsea pipeline ever installed 

 