Installation of subsea pipeline for the flagship Porthos carbon capture and storage project in the Port of Rotterdam, the first development of its kind in the Netherlands.

Company: Gasunie / EBN / Port of Rotterdam

Location: Port of Rotterdam / Dutch North Sea 

Water depth: 13 - 30 metres

Allseas’ first carbon capture and storage (CCS) project 

Shallow water pipelay in tight corridors through busy port approach

Scope of work 

  • Dredging at Maasgeul & pre-sweep pipeline route for UXOs
  • Preparations at P18-A platform
  • Pull-in through HDPE conduit at future gas compressor station
  • Installation of ~20-km, 16-inch CCS pipeline (shore to platform)
  • Fabrication of riser & spool
  • Trenching & commissioning of the pipeline
  • Diving works (tie-in spool, subsea clamps for riser & boat landing)
Image
Start-up of the Porthos pipeline

Specials & challenges 

  • Allseas’ first carbon capture and storage (CCS) project
  • First CCS project of its kind in the Netherlands
  • Shallow water pipelay in tight corridors through busy port approach
Image
Oceanic performing pre-lay survey
Image
Arrival offshore pipes at Rhenus, Rotterdam
Image
Pipe pull-in to future compressor station at Maasvlakte
Image
Pull-in head at compressor station location
Image
Production of the 16-inch concrete-weight coated pipeline
Display on a map
On