Installation of a 36-inch concrete-coated export line, with tie-in points, connecting the iconic Troll A platform with gas reserves in the Troll West field

Company: Equinor

Location: Northern North Sea (approx. 80 km northwest of Bergen, Norway)

Water depth: 300 metres

Pipeline pull-in through tube at platform base

Laydown in pre-installed foundations

Severe winter conditions

Scope of work 

  • Subsea preparations for pull-in at Troll A
  • Installation & removal of 20 counteracts
  • Installation of 26-km, 36-inch concrete-coated pipeline and two inline tees (ILTs)
  • Pull in of 36-inch pipeline into pull tube at platform base
  • Design, fabrication & supply of materials for laydown heads and installation aids
Image
Pull-in through tube

Specials & challenges 

  • Pipeline pull-in to tube at platform base using linear winch on platform deck
  • Installation of 2x 36-inch ILTs
  • Laydown of pipeline with 36/20-inch connectors in pre-installed foundation templates
  • Environmental conditions in the Norwegian North Sea during winter preparation and installation window
  • Counteract installation/removal complexity due to high‑mass modules and tight installation windows
  • Strict welding & qualification criteria
Image
ILT installation in S-mode
Image
36-inch connector passing SOL stinger
Image
Solitaire metres from Troll A
Image
Pipeline pull-in to platform base
Display on a map