Installation of gas and oil export pipelines connecting the future Hugin A platform to onshore terminals at Øygarden and Kartso, Norway for processing. 

Company: Equinor

Location: Central North Sea, 160 kilometres west of Bergen

Water depth: 110 - 140 metres

Solitaire executing full pipelay scope independentl

ILT dimensions push the limits of Solitaire’s tensioner and stinger envelope

Pioneering Spirit to install massive Hugin A topsides in 2026

Scope of work 

  • Design & fabrication of inline-tee (ILT) structure & pipeline heads
  • Installation of 73-kilometre, 28-inch carbon steel gas pipeline (incl. ILT)
  • Installation of 46-kilometre, 24-inch carbon steel oil pipeline
  • Pre-commissioning (flood, clean, gauge & pressure test)
  • Pre- & post-lay survey
  • Pipe storage & load out
  • Boulder relocation
Image
Mobilisation in Rotterdam

Specials & challenges 

  • Size of structure relative to tensioner and stinger envelope
  • Pipelay without CSV
  • Solitaire to perform her own TDP monitoring
Image
Gas export pipeline start-up head
Image
Field-joint coating
Image
Solitaire installing the gas pipeline
Display on a map
On