Landmark pipelay project covering engineering, procurement, construction and installation of a rigid riser-based subsea system for development of Brazil’s largest oil field, Búzios-10.

Company: Petrobras

Location: Campos Basin (180 kilometres off the coast of Rio de Janeiro)

Water depth: 1720 - 2190 metres

One of the most significant contracts in Allseas’ history

111 km of rigid risers and flowlines in ultra-deep waters

Risers configured in a ‘lazy wave’ formation

Follows successful Rota 1, Rota 2 & Rota 3 campaigns

Scope of work 

  • Detail design of the risers, pipelines & structures
  • Procurement & supply of cladded linepipe & coating materials
  • Procurement & supply of installation accessories (incl. flex joints, forgings, valves, diverless connectors, VIV-strakes, riser buoyancy & anchoring systems)
  • Design & fabrication of PLETs, jumpers, crossing structures, suction piles & sleepers
  • Installation of flowlines & production & injection risers
  • Installation of 16x steel catenary risers (incl. flexible joints, VIV strakes & buoyancy modules to enable “lazy wave” connection to FPSO)
  • Installation of 16x PLETs & 16x jumpers interconnecting PLETs to Wet Christmas Trees
  • Anchoring of the risers & PLETs
  • Pre-commissioning services: flood, gauge & hydrotest the pipelines from PLET to FPSO
Image
Audacia laying flowlines

Specials & challenges 

  • Full EPCI scope
  • S-lay riser & flowline installation
  • Possible pre-installation of pipelines ahead of FPSO arrival