Client: SapuraOMV 

Location: Sarawak, Malaysia 

87

Max. water depth

Scope of work

  • Installation of ~78-km, 30-inch gas pipeline
  • Installation of 22x buckle initiator/crossing structures, as well as fabrication & installation of concrete mattresses at the crossing locations
  • Fabrication and load-out of 1x riser and 2x spools
  • Riser / tie-in spools installation by Air- and SAT diving
  • Pre-commissioning activities (flooding, cleaning, gauging and hydro-testing)
  • Pre-, post-lay and as-built surveys

~78-km

30-inch gas pipeline

Image
2023 Jerun Development

Project specials

  • Fast-track project; short preparation and lead-in times
  • Riser installation in three sections
  • Subcontracted diving vessel
  • Fabrication and installation of 2x large spool pieces

2x 

large spool pieces

Image
2023 Jerun Development
Image
2023 Jerun Development
Image
2023 Jerun Development
Display on a map
On