Engineering, procurement, installation and commissioning (EPIC) of a 300-km ultra-deepwater pipeline system connecting the Santos Basin pre-salt natural gas fields off Brazil's southeastern coast with an onshore refinery near Rio de Janeiro. 

Company: Petrobras 

Location: Santos Basin, Atlantic coast of southeastern Brazil 

Water depth: 2300 m 

300-kilometre ultra-deepwater pipeline 

Installation of 9 vertical M-shaped jumpers 

Complex pre-commissioning programme 

Scope of work 

  • Full EPIC contract (free-issued pipe)
  • Installation of 143-km, 24-inch & 155-km, 20-inch export pipelines
  • Installation of structures (5x PLEMs, 3x PLETs, 7x inline tees, 2x inline wyes & 3x inline ball valves)
  • Installation of 9x vertical M-shaped jumpers (sizes 14-inch, 20-inch & 24-inch)
  • Free span corrections & 15x pipeline / fibre-optic cable crossings
  • Flooding, gauging, testing (FGT), dewatering & pre-commissioning of the complete system 

143-km, 24-inch & 155-km, 20-inch 

export pipelines 

Image
2016 Rota 3 (1)

Specials & challenges 

  • Onshore transport & storage in Brazil 
  • In-house fabrication (AFBV, Heusden) of structures 
  • Total of 2.5 years of support vessel days 
  • Extremely tight procurement & fabrication schedule 
  • New project office established in Rio de Janeiro 
  • Lorelay equipped with active heave compensated (AHC) deep-water winch for jumper installation scope 
  • Stringent verticality requirements for ILTs & ILYs (for future tie-in by Petrobras) 
  • Complex pre-commissioning programme (dual diameter pigging: 24-inch & 20-inch reverse through the ILYs; max. 90 days of raw seawater in pipeline; dewatering & nitrogen purging) 
  • Modifications to Calamity Jane for handling coiled tubing spread for recovery of MEG & N² purge at 2200 m water depth 