Installation of a 262-kilometre export pipeline that will connect the Barossa field development to the future Darwin Pipeline Duplication and transport natural gas to the Darwin LNG facility in Australia’s Northern Territory.  

Company: Santos

Location: Offshore Darwin, NT, Australia  

Water depth: 254 metres

Largest ever S-mode PLET installation by Audacia

Supply chain stretching thousands of kilometres

Scope of work 

  • Installation of 262-km, 26-inch carbon steel export pipeline, with external anti-corrosion & concrete coating & internal flow coating
  • Procurement of line pipe
  • Coating of line pipe
  • Design, fabrication & installation of 2x PLETs
  • Pipeline route optimisation & mattress installation at crossing locations
  • Detailed design of span assessment & installation of span correction materials
  • Pre-commissioning activities (flooding, cleaning, gauging & hydro-testing)
  • Post-lay & as-built surveys 
Image
Barossa Gas Export Pipeline (GEP) content

Specials & challenges 

  • First project in NT Australia / Timor Sea
  • Supply chain stretching thousands of kilometres (Kuantan, Malaysia to Darwin)
  • Extreme tidal fluctuations (7 metres) & extreme weather conditions
  • Largest ever S-mode PLET installation by Audacia
  • Project delays resulting from legal challenge to the pipeline route, causing rescheduling of offshore works during vessel mobilisation  
Image
Barossa Gas Export Pipeline (GEP)
Image
Barossa Gas Export Pipeline (GEP)
Image
Barossa Gas Export Pipeline (GEP)
Image
Pipe supply
Image
Audacia and Fortitude on standby
Image
Welding the 26-inch pipeline
Image
Audacia passes the halfway point
Image
Transfer of equipment
Image
Teamwork
Display on a map
On