Installation of piggybacked production pipeline between the F-O drilling field and its FA production platform for the Mossel Bay gas-to-liquids (GTL) refinery in South Africa’s Western Cape. 

Company: PetroSA 

Location: Mossel Bay, South Africa 

160 m 

Max. water depth

Scope of work 

  • Procurement (incl. pipeline anodes, piggyback blocks, strapping & heat shrink sleeves) 
  • Fabrication of installation aids, pipeline heads, flange assemblies, cocoons & sleepers 
  • Welding trials & qualifications 
  • Installation of 37-km, 12-inch production pipeline (incl. 4-km cladded section) 
  • Installation of 37-km, 3-inch MEG pipeline piggybacked onto 12-inch pipeline 
  • Flooding, gauging & hydro-testing of 12-inch line 
  • Flushing & hydro-testing of 3-inch MEG line 
  • Survey support & free span rectification 

37-km

3-inch MEG pipeline piggybacked onto 12-inch pipeline 

Image
2012 Project Ikhwezi

Specials & challenges 

  • Qualify & weld 12-inch cladded pipe (incl. engineering critical assessment) 
  • Digital X-ray in combination with internal welding inspection tool (IWIT) for 12-inch cladded pipe 
  • 3-layer heat shrink sleeves (HSS) field joint coating, requiring liquid epoxy primer with curing at 180 ºC 
  • Piggyback blocks for sliding piggy-back pipeline mechanism due to large expansion differences 
  • Supply and pipeline flooding of 3500 m³ potable water 
  • High pressure hydrotest at 533 bar (in-house design) to accommodate 5-layer syntactic polypropylene flowline insulation 

533 bar

High pressure hydrotest