Our worldwide project highlights

With over 300 projects and more than 28,000 kilometres of subsea pipeline installed worldwide, we continually set new standards for excellence. Our state-of-the-art vessels excel in deepwater installation, pipelay and single lift installation, removal and transport. We design, build and execute for project scopes involving complex pipelay and heavy lift.

Image
2014 Rota Cabiúnas

Rota Cabiúnas Trunkline

Installation of Brazil’s longest subsea pipeline, transporting natural gas 380 kilometres from the deepwater Tupi field to the onshore processing plant at Cabiúnas, in the State of Rio de Janeiro, Brazil.

Image
Laggan-Tormore

Laggan-Tormore Project

Engineering and installation of ~500 kilometres of mixed diameter pipelines for the innovative “subsea-to-shore” tie-back system connecting the Laggan and Tormore fields with the new gas processing at Sullom Voe, Shetland Islands. 

Image
2023 Tommeliten Alpha

Tommeliten Alpha

Installation of direct electrical heating cable (DEH) flowline system to tie back the Tommeliten Alpha gas field to existing infrastructure at the Ekofisk complex in the southern Norwegian North Sea. 

Image
2013 Lucius Oil Pipeline

Lucius Deepwater Development Project

Installation of two (north and south) 18-inch oil export pipeline segments connecting the Lucius field to existing infrastructure in the ultra-deep Central Gulf of Mexico.  

Image
2012 P-62 Pipeline

P-62 Pipeline

Installation of 12-inch export pipeline connecting the ultra-deepwater Roncador field development with existing infrastructure, offshore Brazil.  

Image
2012 Project Ikhwezi

Project Ikhwezi

Installation of piggybacked production pipeline between the F-O drilling field and its FA production platform for the Mossel Bay gas-to-liquids (GTL) refinery in South Africa’s Western Cape. 

Image
Tamar Field Development

Tamar Field Development

Installation of dual 148-kilometre export pipeline bundles (16-inch piggybacked with 4-inch MEG) and five 10-inch utility lines connecting the deepwater Tamar gas field to the Tamar platform. 

Image
2012 Capixaba Profundo

Capixaba Profundo (GSNC-12)

Installation of 12-inch export pipeline connecting the ultra-deepwater Profundo development with shallow water infrastructure, offshore Brazil.  

Image
2010 Nord Stream

Nord Stream

Installation of the critical 343-kilometre northern section of the world’s longest subsea pipeline linking Russia’s vast natural gas reserves with the European Union via the Baltic Sea.