Our worldwide project highlights

With over 340 projects and approximately 30,000 kilometres of subsea pipeline installed worldwide, we continually set new standards for excellence. Our state-of-the-art vessels excel in deepwater installation, pipelay and single lift installation, removal and transport. We design, build and execute for project scopes involving complex pipelay and heavy lift.

Image
Ekofisk 2/4G jacket removal

Ekofisk 2/4G jacket

Engineering, preparation and removal of former 2/4G riser platform jacket from the North Sea’s Ekofisk field and delivery to Aker Solutions’ Stord yard for disposal. 

Image
Southeast Gateway

Southeast Gateway Pipeline

Image
Lorelay next to N05-A platform

NO5-A

Installation of 15-kilometre shallow water pipeline for the flagship N05-A natural gas development in the Dutch North Sea.

Image
Pioneering Spirit pulling in the 30-inch line

Statpipe New Landfall

Nearshore pipelay installation by the world’s largest construction vessel, including dual tunnel pull-ins, for the new Statpipe landfall approach in Kalstø, Norway.

Image
2024 Greater Tortue Ahmeyim

Greater Tortue Ahmeyim (GTA)

Installation of flowline sections for bp’s ultra-deepwater GTA development offshore Mauritania & Senegal, requiring redesign of structures and appendages and bespoke engineering and fabrication to modify S-lay installation vessel for J-mode activities. 

Image
Barossa Gas Export Pipeline (GEP) hero

Barossa Gas Export Pipeline (GEP)

Installation of a 262-kilometre export pipeline that will connect the Barossa field development to the future Darwin Pipeline Duplication and transport natural gas to the Darwin LNG facility in Australia’s Northern Territory.  

Image
2024 D’Yeu-Noirmoutier OSS Installation

D’Yeu-Noirmoutier OSS Installation

Installation of the offshore substation (OSS) for the 496-megawatt Eoliennes en Mer Iles d’Yeu et de Noirmoutier wind farm project, off the Pays-de-la-Loire coast, France. 

Image
Brent Charlie arrives at decommissioning yard in Hartlepool, England, after a successful transfer and load-in operation.

Brent Charlie topsides removal

Historic single-lift removal of the 31,000-tonne Brent Charlie topsides – fourth and final iconic Brent field platform removals – and delivery to the UK for recycling. 

Image
2022 Anchor Export Pipelines

Anchor Export Pipelines

Installation of oil and gas export lines for Chevron’s breakthrough deepwater Anchor field development, the first 20,000 psi production hub in the Gulf of Mexico. 

Image
Jerun Development

Jerun Development

Image
2022 Whale Oil & Gas Export Pipelines

Whale Oil & Gas Export Pipelines

Construction of 18-inch oil and gas export pipeline connecting the ultra-deepwater Whale field with existing platform and pipeline infrastructure in the southern Gulf of Mexico.