Our worldwide project highlights

With over 340 projects and approximately 30,000 kilometres of subsea pipeline installed worldwide, we continually set new standards for excellence. Our state-of-the-art vessels excel in deepwater installation, pipelay and single lift installation, removal and transport. We design, build and execute for project scopes involving complex pipelay and heavy lift.

Image
Fortitude and Audacia

Búzios-10

Landmark pipelay project covering engineering, procurement, construction and installation of a rigid riser-based subsea system for development of Brazil’s largest oil field, Búzios-10.

Image
Solitaire in the GOM

Sparta Export Pipelines

Installation of gas and oil export pipeline system, including 2.5-kilometre steel catenary risers (SCRs), to serve the Sparta deepwater development in the Gulf of Mexico

Image
Pioneering Spirit en route to the BorWin5 wind development

BorWin5

Transport & installation of the 900 MW converter station for the BorWin5 offshore grid connection system, off the coast of Borkum in the German North Sea.

Image
Heather Alpha platform

Heather Alpha topsides removal

Engineering, preparation & single-lift removal of the 15,300-tonne Heather Alpha production and drilling topsides from the UK North Sea.

Image
Pioneering Spirit fast lift Eider Alpha topsides

TAQA UK’s Northern North Sea (NNS) assets

Multi-year UK North Sea decommissioning contract with TAQA UK, covering removal and disposal of 120,000+ tonnes of offshore infrastructure

Image
Solitaire installing the gas pipeline

Yggdrasil

Installation of gas and oil export pipelines connecting the future Hugin A platform to onshore terminals at Øygarden and Kartso, Norway for processing. 

Image
Artist impression of West White Rose platform

West White Rose

Transport and single-lift installation of 23,000-tonne integrated drilling platform to serve the White Rose field expansion in the Jeanne d’Arc Basin, offshore Newfoundland and Labrador, Canada.

Image
Hod platform - courtesy Aker BP

Valhall Hod platform removal

Engineering, preparation, removal & disposal of the original Hod production platform from the southern Norwegian North Sea. 

Image
Installation of 16-inch CCS pipe

Port of Rotterdam CO2 Transport Hub and Offshore Storage (Porthos)

Installation of subsea pipeline for the flagship Porthos carbon capture and storage project in the Port of Rotterdam, the first development of its kind in the Netherlands.

Image
Nearshore pipelay by Sandpiper

Darwin Pipeline Duplication (DPD)

Construction of 122-kilometre dual diameter carbon steel nearshore pipeline connecting the Barossa Gas Export Pipeline to the Darwin LNG (DLNG) facility in Australia’s Northern Territory.

Image
Lorelay returning to Trinidad

Mento A pipeline

Fast-track installation job for 16-inch multiphase pipeline connecting new and existing platform infrastructure off Trinidad’s southeastern coast.